Metro Trains West
ICMS — Integrated Condition Monitoring System
OPERATIONAL | NORMAL | OCC CER1 — SMF | BOCC CER2 — Westmead SYNC | AWS Data Lake CONNECTED
10 Source Interfaces Active --:--:-- 2026-09-01 ← Home Sign out
SMW·ICMS
Active Alarms
6
4 major · 2 minor
Journey Time (WMD↔SCB)
22m 48s
MOS limit 23 min · PS15
On-Time Performance
98.6%
SPMS Timeliness KPI · PS15 §15.7
System Health
98.4%
1 of 9 stations degraded
AWS S3 Lag
0.3s
Redshift sync ✓
Source System Status — 10 IRS Interfaces 7 OK · 3 WARN
RS — Rolling Stock
VCMS + 14 on-board subsystems · Near RT
Points: 2,340
Alarms: 1
Lag: <1s
STCS — Signalling
Train loc · point machine · ML fault · 2s RT
Points: 1,820
Alarms: 0
Lag: 1.8s
CCS — Central Control
Station + linewide alarms · PSD via CCS · 2s
Points: 3,102
Alarms: 0
Lag: 1.9s
iCOM — DCN Backbone
DCN · Backup · NTP time sync for ICMS+AIS
NTP: SYNC
Alarms: 0
Lag: N/A
fCOM — Comms
PA · PIDS · EACS · CCTV · Near RT
Points: 890
Alarms: 0
Lag: <1s
PSD — Platform Screen Doors
Door status · cycles · current · 2s/10s
Points: 1,440
Alarms: 0
Lag: 1.7s
DEQ — Depot
VCMS · Train Wash · Wheel Lathe · Auto
Points: 620
Alarms: 1
Lag: 2.1s
cBMCS — Building Services
Lifts · Escalators · HVAC · Fire · LV · 2s
Points: 2,180
Alarms: 2
Lag: 1.9s
TfNSW / TMC
SIRI/GTFS · EV analytics · 5s
SIRI: 6 MSG
Alarms: 0
Lag: 4.8s
IMV — Tunnel Survey
Laser tunnel · track geometry · Near RT+bulk
Points: 455
Alarms: 0
Lag: <1s
Active Alarms 6 ACTIVE
SeveritySourceDescriptionStationTime
MAJOR cBMCS NST_L1_CHWP-701-01-VSD_Flt — VSD Fault Active NST 07:23:14
MAJOR iCOM/RAD PortSfpStatusFailure — SFP device failed on DCN node NST 07:31:02
MINOR cBMCS CMSF_L0_CHWP-701-02-VSD_Amp — Motor current elevated 48.2A CMSF 07:44:38
MAJOR DEQ Train Wash Plant — Pressure Sensor Malfunction (Rm 1065A) SMF 06:52:19
MINOR ETS/CCS Gate G-104 — Operational Status: Fault SCB 07:12:47
MAJOR TVCS/CCS Tunnel Vent Fan 1 — Motor Bearing Vibration HiHi (7.1mm/s) TBY–PYR 07:08:03
Station Health Matrix 8 OK · 1 WARN
System WMD PTA OLP NST BWT FDK TBY PYR SCB
cBMCS — Building Mechanical Control System 2s polling · Lifts, Escalators, HVAC, Fire, LV
Equipment Groups
Alerts
Stations
All Equipment — 9 Stations + CMSF 0 points
Equipment Name ID Signal Tag Point Description Value Unit Quality Last Updated
PSD — Platform Screen Doors CCS IOclass · 2s/10s polling · All 9 stations
Station
Summary
Total doors160
Closed160
Faults0
Total cycles today0
All Stations — Platform Screen Door Status · CCS.PSD tag format 160 doors
Station Platform Door ID Signal Tag Door Status Cycle Count Current Draw (A) Last Activity
STCS — Signalling & Train Control System Train position · Point machine · Axle counters · ML fault
Categories
Fleet Live
Train Movements & Signalling — 2s polling interval 86 signals
Asset / Description Signal Tag Type Current Value State / Unit Quality Last Updated
AIS — Asset Information System EAM (Match Contractor, native) + Cosol RAM/KPI layer · ICD ICMS.AIS.01
Views
Data Flow
EAM → ICMS asset master data
ICMS → EAM condition + fault/alert feed
No direct physical interface — via DCN
SIRI / GTFS — TfNSW Real-Time Interface SIRI = Service Interface for Real Time Information · GTFS = General Transit Feed Specification · ICMS AWS ↔ TfNSW Data Hub · external LAN, not DCN · Toustone (Cosol) provider
Message Types
Compliance
Static GTFS forward horizon94 / 90d
Next change-notice windowDay 14/21
SIRI / GTFS Message Log — SCS-4403–4429 — messages
Dir Message Type Summary Source SLA / Accuracy Time
Electricity Consumption Model IPMVP Option C · HV/LV sub-metering by Station + SMF · GS-OPS-333–359
12-month rolling baseline · next reset: Year 7 (2033)
Baseline vs Actual — Adjusted Baseline Period Consumption 9 Stations + SMF + RSF · ≤5% error margin
Annual Electricity Reduction Opportunities — Compliance Year 2027 — of 5 target
OpportunityScopeEst. SavingStatus
Year 7 / Year 11 Reset — Detailed Opportunity Analysis & Investment Business Case Next reset: Year 7 (2033)
Use Cases — What ICMS / AIS / SIRI / Electricity Can Demonstrate Every card traces to a real PS/GS/IRS requirement — click "Run demo" to see it live in this mockup